- Location: Phoenix, AZ
- Delivery Method: CMAR
- Services: Pipeline Rehabilitation
Project Details
B&F replaced over 20,000 LF of 6 to 12-inch DIP including approximately 16,900 LF of 6-inch DIP, 3,000 LF of 8-inch DIP, 2,600 LF of 12-inch DIP water main. Waterline appurtenances included 34 fire hydrants and 400 services in residential and arterial street locations. We replaced 6,590 SY of asphalt paving, 72,000 SY of slurry and micro-seal and installed a 24-inch steel casing and waterline underneath the UPRR tracks.