- Location: Phoenix, AZ
- Delivery Method: JOC
- Services: HDPE Pipe Fusion
Description
B&F Contracting contracted with PCRWRD to reduce the diameter of a 6” DIP force main to increase the efficiency of the Mountain Gardens Lift Station submersible pumps and eliminate odor issues. B&F; presented two (2) different slip-lined options including a Primus and HDPE liner, and the County chose to move forward with a 4” SDR17 HDPE slip-liner option. B&F; excavated (4) Inversion and Receiving pits, and pulled in approximately 1350 LF of 4” HDPE Pipe. The project also included an installation of a wet well aeration equipment, roof installation to cover wet well controls, site electrical work, sewer bypass, re-landscaping, ARV Installation and paving work.