• P: (623) 582-1170

City of Tempe Emergency Sewer Repair

City of Tempe Emergency Sewer Repair

Project Details

  • Location:Tempe, AZ
  • Delivery Method:JOC
  • Services:Bypass Pumping
  • Description:The City of Tempe called B&F regarding and imminent pipe collapse on a 27-inch unlined concrete sewer pipe. The 27-inch line had a complete failure at the flow line and caused the top pipe to collapse inside the bottom cradle of the pipe. B&F worked with the City to develop a scope of work required to rehabilitate the unlined concrete pipe and manholes. This work included the removal and replacement of 46 linear feet (LF) of 27-inch, CIPP lining of 1984 LF of unlined concrete pipe and coating existing manholes with JPCI Sewer Shield. B&F also CIPP lined the 46 LF of replacement pipe sewer line. B&F had to developed a bypass plan to dry up two each 27-inch lines upstream and the five each lateral lines that entered the pipe to create one large bypass system.

Related Projects

Pima County Regional Wastewater Reclamation Department Old Nogales Interceptor

CMAR / Public Utility Infrastructure

City of Phoenix SROG Southern Avenue Interceptor & Manhole Rehabilitation

Bypass Pumping / Design-Build

Gilbert Emergency Commons Lift Station

Bypass Pumping / Emergency Response

Quail Creek Lift Station

Design-Build / JOC