• P: (623) 582-1170

Gilbert Emergency Commons Lift Station

Gilbert Emergency Commons Lift Station

Project Details

  • Location:Gilbert, AZ
  • Delivery Method:JOC
  • Services:Emergency Response, Bypass Pumping
  • Description:The Town of Gilbert called Jerry Sheatz at 4:00 pm and he mobilized our submersible pumps, pipe and fittings and had the 1500 GPM Emergency bypass set up by 10:00 pm. The emergency was due to the station losing an electrical panel and pump. Our system was used as a backup to the one remaining operational pump. B&F also provided labor to run the pumps as needed when the Town of Gilbert had to do maintenance on their single remaining pump. The emergency pumping equipment remained on site until their pump was repaired.

Related Projects

19th Avenue and Osborn Emergency Repair

Bypass Pumping / Emergency Response

City of Phoenix SROG Southern Avenue Interceptor & Manhole Rehabilitation

Bypass Pumping / Design-Build

Layton Lakes Force Main Rehabilitation

CMAR / HDPE Pipe Fusion

Greenfield Rd Wastewater Force Main Emergency Repair & Rehabilitation

Emergency Response / HDPE Pipe Fusion