• P: (623) 582-1170

Harrison St to Van Buren St and 31st Ave – 27th Ave Water Main Replacement

Harrison St to Van Buren St and 31st Ave – 27th Ave Water Main Replacement

Project Details

  • Location:Phoenix, AZ
  • Delivery Method:CMAR
  • Services:Pipeline Rehabilitation
  • Description:B&F replaced over 20,000 LF of 6 to 12-inch DIP including approximately 16,900 LF of 6-inch DIP, 3,000 LF of 8-inch DIP, 2,600 LF of 12-inch DIP water main. Waterline appurtenances included 34 fire hydrants and 400 services in residential and arterial street locations. We replaced 6,590 SY of asphalt paving, 72,000 SY of slurry and micro-seal and installed a 24-inch steel casing and waterline underneath the UPRR tracks.

Related Projects

Town of Paradise Valley Traffic Signal Upgrades

JOC / Public Utility Infrastructure

North Rillito Interceptor Pipeline Rehabilitation

Bypass Pumping / CMAR

Layton Lakes Lift Station Pump Retro-Fit

JOC / Water/Wastewater

Mountain Gardens Pump Station

HDPE Pipe Fusion / JOC