• P: (623) 582-1170

Layton Lakes Lift Station Pump Retro-Fit

Layton Lakes Lift Station Pump Retro-Fit

Project Details

  • Location:Gilbert, AZ
  • Delivery Method:JOC
  • Services:Water/Wastewater
  • Description:B&F was selected as the CMAR on this project that involves the rehabilitation of over 25,000 LF of existing 14” and 18” cement-lined DIP force mains. This project included the mixed-method repair and rehabilitation of 24,626 LF of existing parallel 14”, and 18” cement lined ductile iron pipe wastewater force mains using HDPE Slip Lining trenchless technology and open-cut replacement.

Related Projects

Mountain Gardens Pump Station

HDPE Pipe Fusion / JOC

Quail Creek Lift Station

Design-Build / JOC

Sanitary Sewer Collection System Emergency Repair & Replacement

Bypass Pumping / Emergency Response

Layton Lakes Force Main Rehabilitation

CMAR / HDPE Pipe Fusion