- Location: Gilbert, AZ
- Delivery Method: JOC
- Services: Water/Wastewater
Project Details
B&F was selected as the CMAR on this project that involves the rehabilitation of over 25,000 LF of existing 14” and 18” cement-lined DIP force mains. This project included the mixed-method repair and rehabilitation of 24,626 LF of existing parallel 14”, and 18” cement lined ductile iron pipe wastewater force mains using HDPE Slip Lining trenchless technology and open-cut replacement.