Layton Lakes Lift Station Pump Retro-Fit

  • Location: Gilbert, AZ
  • Delivery Method: JOC
  • Services: Water/Wastewater

Project Details

B&F was selected as the CMAR on this project that involves the rehabilitation of over 25,000 LF of existing 14” and 18” cement-lined DIP force mains. This project included the mixed-method repair and rehabilitation of 24,626 LF of existing parallel 14”, and 18” cement lined ductile iron pipe wastewater force mains using HDPE Slip Lining trenchless technology and open-cut replacement.

Scroll to top