• P: (623) 582-1170

Mountain Gardens Pump Station

Mountain Gardens Pump Station

Project Details

  • Location:Phoenix, AZ
  • Delivery Method:JOC
  • Services:HDPE Pipe Fusion
  • Description:B&F Contracting contracted with PCRWRD to reduce the diameter of a 6” DIP force main to increase the efficiency of the Mountain Gardens Lift Station submersible pumps and eliminate odor issues. B&F presented two (2) different slip-lined options including a Primus and HDPE liner, and the County chose to move forward with a 4” SDR17 HDPE slip-liner option. B&F excavated (4) Inversion and Receiving pits, and pulled in approximately 1350 LF of 4” HDPE Pipe. The project also included an installation of a wet well aeration equipment, roof installation to cover wet well controls, site electrical work, sewer bypass, re-landscaping, ARV Installation and paving work.

Related Projects

City of Peoria Streetlights and Traffic Systems

JOC / Public Utility Infrastructure

Sanitary Sewer Collection System Emergency Repair & Replacement

Bypass Pumping / Emergency Response

City of Tempe Emergency Sewer Repair

Bypass Pumping / JOC

Harrison St to Van Buren St and 31st Ave - 27th Ave Water Main Replacement

JOC / Pipeline Rehabilitation