This project consisted of a 12 MGD sewer bypass for the City of Phoenix, who needed to replace the electrical infrastructure at the station. Working with the City, we were able to supply a turnkey solution that eliminated the sewer bypass from conflicting with construction. Additionally, the bypass design saved on equipment while keeping lift station operational. Utilizing two manholes reduced modification costs of suction locations. Upon installing the bypass system, one of the 24” force mains was not available. After doing new calculations, the system was determined to be able to handle the change in conditions without new equipment or a delay in the schedule.