Lift Station 66 Sewer Bypass

This project consisted of a 12 MGD sewer bypass for the City of Phoenix, who needed to replace the electrical infrastructure at the station. Working with the City, we were able to supply a turnkey solution that eliminated the sewer bypass from conflicting with construction. Additionally, the bypass design saved on equipment while keeping lift station operational. Utilizing two manholes reduced modification costs of suction locations. Upon installing the bypass system, one of the 24” force mains was not available. After doing new calculations, the system was determined to be able to handle the change in conditions without new equipment or a delay in the schedule.

Owner

Service

Location

Market

Delivery Method

Completion Date

City of Phoenix
Pump Solutions
Phoenix, AZ
Municipal
DBB
Ongoing. Est. 2024

Owner

City of Phoenix

Services

Pump Solutions

Location

Phoenix, AZ

Market

Municipal

Delivery Method

DBB

Completation Date

Ongoing. Est. 2024

similar projects

;