PSHIA Swift Ramp 12-inch Sanitary Sewer Rehabilitation

The project involved the placement of a temporary sewer bypass for Rummel Construction. This was to allow a CIPP lining of the existing 12” sewer. Cleaning and CCTV were required prior to lining operation. The location of the sewer bypass required permits and only certain employees were able to meet the requirements to work on […]
27-inch Sanitary Sewer Line Rehabilitation

B&F was the subcontractor chosen to complete the rehabilitation of over 530 LF of 27-inch sewer line with CIPP lining as part of the Phoenix Sky Train Stage 2 project. B&F developed a flow through bypass plan to manage flows coming from the 6-inch sewer service to the west from the Shuttle Bus Facility using […]
Sky Train APS Super Feeders

B&F completed the installation of all the feeder conduit for Sky Harbor’s Sky Train. Our team was brought in during the design phase to provide value engineering solutions and underground utility exploration. We installed fourteen manholes and approx. 10,000 linear feet of 5” conduit. All the conduits were racked and encased. The project had to […]
PSHIA Sky Train Street Station

B&F provided street light installation services for the City of Phoenix’s Sky Train. Our team was assigned to complete the roadway lighting, wayfinding power and SES power on the 24st Station Facilities Parking Lot 001. B&F bored and installed 1-inch conduit, #8 and #10 wire/ground, and five #7 pull boxes for the wayfinding. Our team […]