Project MAB
B&F was requested to complete the installation of APS feeders for a new manufacturing facility in Glendale, AZ. The project included installing over 63,000 LF of 5-inch PVC conduit and over 5,500 of 1-to 4-inch PVC conduit. Our team installed large switch cabinets and completed the excavation, installation of conduit, and backfill with slurry. Additionally, […]