B&F was selected by Tetra Tech BAS, Inc. to complete work on the SR85 Landfill. B&F provided the labor and equipment for multiple projects. Our team mobilized along with a 500 gallon vactor trailer for cleaning pumping. Additionally, B&F completed the installation of a new vault and reconstruction of manholes. B&F also provided a 6-inch Godwin pump 2257, four 4-inch 20’ suction hoses, and two 4-inch hose screens for the client.