Hub @ 202

B&F completed the underground utilities for the Hub @ 202 Industrial Complex. The wet utility scope of work consisted of the installation of 6- and 8-inch sewer main, 12- to 48-inch storm drain, and 3- to 8-inch waterline. The project also included the installation of catch basins, sewer and SD manholes, concrete encasements, gate valve […]

West 202 Logistics Wet Utilities

B&F was selected to complete the wet utility installation for a new logistics facility. The project included the installation of over 5,800 LF of 10- to 12-inch domestic waterline, over 17,000 LF of 6- to 10-inch fireline, 5,250 LF of sewer and 18 manholes. The project also included installation of fire hydrants, an irrigation system, […]

West 202 Logistics Dry Utilities

B&F needed to provide power and telecommunications to a new logistics facility. The project involved the installation of SRP Feeder, Primary and secondary to the newly developed commercial properties. The project also involved an overhead / underground conversion, along with the installation of Lumen and Cox facilities. B&F worked with the Willmeng Team to move […]

NTT Data Center Phase 1

B&F was needed to provide wet utility installation services to the NTT Data Center. Our team oversaw the installation of the storm drain, sewer and waterline systems for the Master site and the Building site. For the Master site, B&F installed approx. 2,400 LF of 12- to 24-inch HDPE pipe for the storm drain, 2,700 […]

Comarch Data Center

B&F provided site dry utility services for Comarch Data Center. The project consisted of completing the electrical work, including excavating and encasing switchboard vaults, completing TelCom encasing and furnishing of manhole, provide primary and secondary conduit for SRP, install a transformer pad with slurry backfill, and encase an SRP Feeder and switch cabinet. B&F was […]

43rd Ave Pit Dewatering and Repair

Water released from the Roosevelt dam caused significant pressure on the levee protecting the rock pit and equipment. B&F Pump Solutions immediately mobilized to fuse 18” pipe and supply large volume pumps to reduce the pressure on the levee prior to a breach. Pumps ranged from 5 MGD to 9 MGD.

Project MAB

B&F was requested to complete the installation of APS feeders for a new manufacturing facility in Glendale, AZ. The project included installing over 63,000 LF of 5-inch PVC conduit and over 5,500 of 1-to 4-inch PVC conduit. Our team installed large switch cabinets and completed the excavation, installation of conduit, and backfill with slurry. Additionally, […]

Del Rio Landfill Leak Investigation

B&F performed investigation and repair on a leaking pipe located at Del Rio Landfill. B&F was in charge of completing the excavation and backfill to repair the leaking condensate. Our team layed the 8-inch PVC pipe, completed the fittings and fusion of the new pipe. B&F’s Pump Solutions team provided the backhoe, water trailer, and […]

Skunk Creek Landfill Cleanout Pump

B&F provided rental solutions for Skunk Creek Landfill. We mobilized our 500- and 800-gallon vactor trailers and our experienced crews to complete a pumping cleanout.

SR85 Landfill

B&F was selected by Tetra Tech BAS, Inc. to complete work on the SR85 Landfill. B&F provided the labor and equipment for multiple projects. Our team mobilized along with a 500 gallon vactor trailer for cleaning pumping. Additionally, B&F completed the installation of a new vault and reconstruction of manholes. B&F also provided a 6-inch […]

;