Hub @ 202
B&F completed the underground utilities for the Hub @ 202 Industrial Complex. The wet utility scope of work consisted of the installation of 6- and 8-inch sewer main, 12- to 48-inch storm drain, and 3- to 8-inch waterline. The project also included the installation of catch basins, sewer and SD manholes, concrete encasements, gate valve […]
West 202 Logistics Wet Utilities
B&F was selected to complete the wet utility installation for a new logistics facility. The project included the installation of over 5,800 LF of 10- to 12-inch domestic waterline, over 17,000 LF of 6- to 10-inch fireline, 5,250 LF of sewer and 18 manholes. The project also included installation of fire hydrants, an irrigation system, […]
West 202 Logistics Dry Utilities
B&F needed to provide power and telecommunications to a new logistics facility. The project involved the installation of SRP Feeder, Primary and secondary to the newly developed commercial properties. The project also involved an overhead / underground conversion, along with the installation of Lumen and Cox facilities. B&F worked with the Willmeng Team to move […]
Acero Sheely Farms
B&F provided waterline installation services on this 2-phase project for Acero Sheely Farms. The first phase consisted of completing the fire/domestic water system of 12 to 16-inch DIP waterline and gate valves, vertical realignment, and multiple water meters with vaults. The second phase of the project required a Jack and Bore under Loop 101 to […]
Mesa Gateway 202 Center
B&F was the selected subcontractor in charge of installing sanitary sewer, storm sewer, and private and public water systems for Mesa Gateway 202 Center. Our crews completed the installation of over 10,000 LF of 18 to 72-inch storm drain, 5,500 LF of 4- to 10-inch SDR-35 PVC pipe sanitary sewer, and 7,800 LF of 8- […]