B&F provided waterline installation services on this 2-phase project for Acero Sheely Farms. The first phase consisted of completing the fire/domestic water system of 12 to 16-inch DIP waterline and gate valves, vertical realignment, and multiple water meters with vaults. The second phase of the project required a Jack and Bore under Loop 101 to complete the offsite waterline tie-in. After the installation was completed, our team relocated multiple fire hydrants and valves according to City specifications.