27-inch Sanitary Sewer Line Rehabilitation

B&F was the subcontractor chosen to complete the rehabilitation of over 530 LF of 27-inch sewer line with CIPP lining as part of the Phoenix Sky Train Stage 2 project. B&F developed a flow through bypass plan to manage flows coming from the 6-inch sewer service to the west from the Shuttle Bus Facility using a plug and storage method. Our crews installed 6-inch plugs on the sewer service side and connected them to a flow through plug in the 27-inch sewer using a flexible hose. Additionally, B&F completed the installation of a 5-inch manhole. Project scope also included pipe cleaning, testing, traffic control, and the installation of a specialty 30-inch discharge manifold header.

Owner

Service

Location

Market

Delivery Method

Completion Date

Phoenix Sky Harbor International Airport
Utility Rehabilitation
Phoenix, AZ
Aviation
DBB
2018

Owner

Phoenix Sky Harbor International Airport

Services

Utility Rehabilitation

Location

Phoenix, AZ

Market

Aviation

Delivery Method

DBB

Completation Date

2018