B&F was selected to complete the wet utilities for Chandler Elementary #32. Our team completed the installation of 1,300 LF of 6- 8-inch PVC sewer line, 1,900 LF of 6- and 8-inch DIP waterline, and 18-inch HDPE for the offsite storm drain system. The project scope also included completing the installation of fire hydrants, tapping sleeves and valves, backflow preventers, concrete replacement.