B&F performed investigation and repair on a leaking pipe located at Del Rio Landfill. B&F was in charge of completing the excavation and backfill to repair the leaking condensate. Our team layed the 8-inch PVC pipe, completed the fittings and fusion of the new pipe. B&F’s Pump Solutions team provided the backhoe, water trailer, and vacuum trailer for the job.DBB
