This project included the installation of 1352 LF feet of new 21” VCP in the future alignment of west bound Dixileta Parkway west from Upcountry Way as part of the future Trilogy West subdivision development. The scope of work also included the tie in to an existing 21” stub out at a depth of 26 feet and the installation of five (5) each new 5-foot diameter Armorock acid resistant polymer manholes. B&F supplied the survey and as-builts as part of our contract. The sewer line installation required a deep excavation within the new parkway limits which resulted in the removal and replacement of a 54” RGRCP Storm Drain pipe for us to be able to install the 21” VCP.