With the continued expansion of Grand Canyon University, additional capacity was needed in their sewage outfall system. To fill this need, B&F Contracting installed a new sewer relief system including a new manhole structure over an existing 54” sewer, installation of 3,190 LF of 20-inch HOBAS pipe, 29 LF of 24-inch DIP pipe, and 13 manholes. B&F also provided the surface replacement and required traffic control.