This multiple GMP project was negotiated through B&F’s Wet Utility JOC for the Town of Gilbert. The project scope is to tie-in a newly installed dual force main and install a new gravity sewer 360 LF 36-inch and 1,100 LF of 24-inch for increased capacity with 13 new Armorock manholes from 92- to 60- inch. The project also includes relocation of an SRP storm drain, abandonment of the existing sewer line and manholes, new sidewalk, landscaping, two stamped concrete segments, full AC restoration with slurry seal and the realignment of a 16-inch reclaimed watermain and appurtenances.