Northwest Water/Wastewater Phase 3

B&F was selected to complete a section of the project from the tie-in point at North Valley Parkway to just east of Skunk Creek. 95% of the work was in an active roadway. We completed the installation of a new 30-inch sewer and 36-inch water that will supply the future TSMC plant. Project scope also included two major MOPO operations to tie into an existing 54-inch transmission main and two jack and bores across an existing drainage structure. B&F completed the work through an accelerated schedule in less than nine months from award to substantial completion.

The project also involved multiple critical vertical/horizontal realignment, field fit modifications with the engineer, 26-foot-deep concrete encasements, multiple laterals, and cathodic protection in a tight window during material supply issues. Redesign was required for multiple areas in the field after existing conditions changed to make sewer and water tie-ins. The project tested out successfully the first time and finished ahead of schedule.

Owner

Service

Location

Market

Delivery Method

Completion Date

City of Phoenix
Wet Utilities
Phoenix, AZ
Municipal
CMAR
2022

Owner

City of Phoenix

Services

Wet Utilities

Location

Phoenix, AZ

Market

Municipal

Delivery Method

CMAR

Completation Date

2022