West 202 Logistics Wet Utilities

B&F was selected to complete the wet utility installation for a new logistics facility. The project included the installation of over 5,800 LF of 10- to 12-inch domestic waterline, over 17,000 LF of 6- to 10-inch fireline, 5,250 LF of sewer and 18 manholes. The project also included installation of fire hydrants, an irrigation system, and a storm drain system consisting of around 7,000 LF of HDPE pipe, multiple catch basins, and storm drain manholes.