Novus Innovation Corridor

This project included the removal of approximately 16,000 LF feet of existing cast iron & DIP waterlines, large diameter concrete, clay & PVC sewer lines, large diameter irrigation lines, telephone lines, fiber lines, overhead & underground power lines, 25 street lights, 18 sanitary sewer manholes, 4 telephone, 8 electrical and 4 irrigation structures, as well […]

Campo Bello Elementary School Replacement

B&F provided wet utility services for Campo Bello Elementary School, which included storm drain, sewer, and water. Our crews installed over 1,800 LF of 4- to 18-inch HDPE storm drain, 6 drain basins, 8 catch basins, 650 LF of 4- to 8-inch PVC sewer, 3 manholes, 1,900 LF of 2.5-inch PVC waterline and 386 LF […]

Chandler Elementary #32

B&F was selected to complete the wet utilities for Chandler Elementary #32. Our team completed the installation of 1,300 LF of 6- 8-inch PVC sewer line, 1,900 LF of 6- and 8-inch DIP waterline, and 18-inch HDPE for the offsite storm drain system. The project scope also included completing the installation of fire hydrants, tapping […]

GCU Hazelwood Relief Sewer

With the continued expansion of Grand Canyon University, additional capacity was needed in their sewage outfall system. To fill this need, B&F Contracting installed a new sewer relief system including a new manhole structure over an existing 54” sewer, installation of 3,190 LF of 20-inch HOBAS pipe, 29 LF of 24-inch DIP pipe, and 13 […]

;