Lift Station 66 Sewer Bypass

This project consisted of a 12 MGD sewer bypass for the City of Phoenix, who needed to replace the electrical infrastructure at the station. Working with the City, we were able to supply a turnkey solution that eliminated the sewer bypass from conflicting with construction. Additionally, the bypass design saved on equipment while keeping lift […]

Walmart Off-Site Traffic Signals and Streetlights

B&F was awarded this Design-Bid-Build project in 2011 from the Town of Cave Creek for Wal-Mart. The project included a road widening and full infrastructure rehabilitation of the intersection at Cave Creek Road and Carefree Highway, extending East to 56th Street, and South to Olesen Rd. A significant part of the project included providing new full […]

Higley and Baseline Road Improvements

B&F was selected to improve the traffic signal and street lights located on Higley Rd and Baseline Rd for the Town of Gilbert. The project consisted of installing temporary traffic signals, traffic signal conduit, streetlights, and traffic signal relocation. Our team also completed the installation of fiber optic conduit, pull boxes, Opticom on 3 existing […]

Dobson Road and University Drive Intersection Improvements

The Dobson Road and University Drive Intersection Improvements for the City of Mesa rehabilitated the entire roadway and underground infrastructure for 1½ miles along University Drive and Dobson Road. This restoration work included three major intersections along University Drive. For each of these intersections, the existing traffic signals and streetlights were removed and replaced with […]

Marana Sewer Infrastructure Project

This project was run across Sanders Road just south of Marana Road and combined all the flow to the Marana Wastewater Treatment Plant. B&F constructed two phases for this project to complete a system tie-over and provide additional conveyance options to combat issues with inflow and infiltration (I&I). Our team installed two customized diversion structures, […]

SROG Southern Avenue Interceptor and Manhole Rehabilitation

The project consisted of approximately 140 manholes, 4 bypasses, 5 sections of pipe to rehab, 48 Ring and Cover Adjustment/Replacements & 1 flow diversion. The manhole work was a combination of epoxy rehabilitation and PVC liner repair that spread nearly 17 miles from 87th Avenue and Broadway to 48th Street and Southern Avenue. B&F bypassed […]

Sub-Regional Operating Group (SROG) Salt River Outfall Interceptor Rehabilitation Project E

B&F completed the rehabilitation of 78 active sanitary sewer manholes and four structures identified with structural defect rating of Grade 3 by the 2014 SROG SRO Sanitary Sewer Condition Assessment report. They were located through the SRO alignment, including City of Phoenix ROW or easements, Phoenix Sky Harbor International Airport, ADOT, MCDOT, and City of […]

;