Hub @ 202

B&F completed the underground utilities for the Hub @ 202 Industrial Complex. The wet utility scope of work consisted of the installation of 6- and 8-inch sewer main, 12- to 48-inch storm drain, and 3- to 8-inch waterline. The project also included the installation of catch basins, sewer and SD manholes, concrete encasements, gate valve […]

West 202 Logistics Wet Utilities

B&F was selected to complete the wet utility installation for a new logistics facility. The project included the installation of over 5,800 LF of 10- to 12-inch domestic waterline, over 17,000 LF of 6- to 10-inch fireline, 5,250 LF of sewer and 18 manholes. The project also included installation of fire hydrants, an irrigation system, […]

NTT Data Center Phase 1

B&F was needed to provide wet utility installation services to the NTT Data Center. Our team oversaw the installation of the storm drain, sewer and waterline systems for the Master site and the Building site. For the Master site, B&F installed approx. 2,400 LF of 12- to 24-inch HDPE pipe for the storm drain, 2,700 […]

Campo Bello Elementary School Replacement

B&F provided wet utility services for Campo Bello Elementary School, which included storm drain, sewer, and water. Our crews installed over 1,800 LF of 4- to 18-inch HDPE storm drain, 6 drain basins, 8 catch basins, 650 LF of 4- to 8-inch PVC sewer, 3 manholes, 1,900 LF of 2.5-inch PVC waterline and 386 LF […]

Chandler Elementary #32

B&F was selected to complete the wet utilities for Chandler Elementary #32. Our team completed the installation of 1,300 LF of 6- 8-inch PVC sewer line, 1,900 LF of 6- and 8-inch DIP waterline, and 18-inch HDPE for the offsite storm drain system. The project scope also included completing the installation of fire hydrants, tapping […]

GCU Hazelwood Relief Sewer

With the continued expansion of Grand Canyon University, additional capacity was needed in their sewage outfall system. To fill this need, B&F Contracting installed a new sewer relief system including a new manhole structure over an existing 54” sewer, installation of 3,190 LF of 20-inch HOBAS pipe, 29 LF of 24-inch DIP pipe, and 13 […]

Acero Sheely Farms

B&F provided waterline installation services on this 2-phase project for Acero Sheely Farms. The first phase consisted of completing the fire/domestic water system of 12 to 16-inch DIP waterline and gate valves, vertical realignment, and multiple water meters with vaults. The second phase of the project required a Jack and Bore under Loop 101 to […]

Mesa Gateway 202 Center

B&F was the selected subcontractor in charge of installing sanitary sewer, storm sewer, and private and public water systems for Mesa Gateway 202 Center. Our crews completed the installation of over 10,000 LF of 18 to 72-inch storm drain, 5,500 LF of 4- to 10-inch SDR-35 PVC pipe sanitary sewer, and 7,800 LF of 8- […]

Mystic Lago Gravity Sewer

This multiple GMP project was negotiated through B&F’s Wet Utility JOC for the Town of Gilbert. The project scope is to tie-in a newly installed dual force main and install a new gravity sewer 360 LF 36-inch and 1,100 LF of 24-inch for increased capacity with 13 new Armorock manholes from 92- to 60- inch. […]

Osborn Parallel Sewer

B&F initiated two GMP’s to expedite this project for Scottsdale due to an adjacent reconstruction project starting in early 2021. The project involved the placement of a new, larger sewer main and the development of a custom structure to divert flow off the line to another adjacent line for additional options. B&F worked with the […]

;