Novus Innovation Corridor
This project included the removal of approximately 16,000 LF feet of existing cast iron & DIP waterlines, large diameter concrete, clay & PVC sewer lines, large diameter irrigation lines, telephone lines, fiber lines, overhead & underground power lines, 25 street lights, 18 sanitary sewer manholes, 4 telephone, 8 electrical and 4 irrigation structures, as well […]
Campo Bello Elementary School Replacement
B&F provided wet utility services for Campo Bello Elementary School, which included storm drain, sewer, and water. Our crews installed over 1,800 LF of 4- to 18-inch HDPE storm drain, 6 drain basins, 8 catch basins, 650 LF of 4- to 8-inch PVC sewer, 3 manholes, 1,900 LF of 2.5-inch PVC waterline and 386 LF […]
Chandler Elementary #32
B&F was selected to complete the wet utilities for Chandler Elementary #32. Our team completed the installation of 1,300 LF of 6- 8-inch PVC sewer line, 1,900 LF of 6- and 8-inch DIP waterline, and 18-inch HDPE for the offsite storm drain system. The project scope also included completing the installation of fire hydrants, tapping […]
GCU Hazelwood Relief Sewer
With the continued expansion of Grand Canyon University, additional capacity was needed in their sewage outfall system. To fill this need, B&F Contracting installed a new sewer relief system including a new manhole structure over an existing 54” sewer, installation of 3,190 LF of 20-inch HOBAS pipe, 29 LF of 24-inch DIP pipe, and 13 […]
Acero Sheely Farms
B&F provided waterline installation services on this 2-phase project for Acero Sheely Farms. The first phase consisted of completing the fire/domestic water system of 12 to 16-inch DIP waterline and gate valves, vertical realignment, and multiple water meters with vaults. The second phase of the project required a Jack and Bore under Loop 101 to […]
Mesa Gateway 202 Center
B&F was the selected subcontractor in charge of installing sanitary sewer, storm sewer, and private and public water systems for Mesa Gateway 202 Center. Our crews completed the installation of over 10,000 LF of 18 to 72-inch storm drain, 5,500 LF of 4- to 10-inch SDR-35 PVC pipe sanitary sewer, and 7,800 LF of 8- […]
PSHIA Swift Ramp 12-inch Sanitary Sewer Rehabilitation
The project involved the placement of a temporary sewer bypass for Rummel Construction. This was to allow a CIPP lining of the existing 12” sewer. Cleaning and CCTV were required prior to lining operation. The location of the sewer bypass required permits and only certain employees were able to meet the requirements to work on […]
27-inch Sanitary Sewer Line Rehabilitation
B&F was the subcontractor chosen to complete the rehabilitation of over 530 LF of 27-inch sewer line with CIPP lining as part of the Phoenix Sky Train Stage 2 project. B&F developed a flow through bypass plan to manage flows coming from the 6-inch sewer service to the west from the Shuttle Bus Facility using […]
Sky Train APS Super Feeders
B&F completed the installation of all the feeder conduit for Sky Harbor’s Sky Train. Our team was brought in during the design phase to provide value engineering solutions and underground utility exploration. We installed fourteen manholes and approx. 10,000 linear feet of 5” conduit. All the conduits were racked and encased. The project had to […]
PSHIA Sky Train Street Station
B&F provided street light installation services for the City of Phoenix’s Sky Train. Our team was assigned to complete the roadway lighting, wayfinding power and SES power on the 24st Station Facilities Parking Lot 001. B&F bored and installed 1-inch conduit, #8 and #10 wire/ground, and five #7 pull boxes for the wayfinding. Our team […]