Novus Innovation Corridor

This project included the removal of approximately 16,000 LF feet of existing cast iron & DIP waterlines, large diameter concrete, clay & PVC sewer lines, large diameter irrigation lines, telephone lines, fiber lines, overhead & underground power lines, 25 street lights, 18 sanitary sewer manholes, 4 telephone, 8 electrical and 4 irrigation structures, as well […]

27-inch Sanitary Sewer Line Rehabilitation

B&F was the subcontractor chosen to complete the rehabilitation of over 530 LF of 27-inch sewer line with CIPP lining as part of the Phoenix Sky Train Stage 2 project. B&F developed a flow through bypass plan to manage flows coming from the 6-inch sewer service to the west from the Shuttle Bus Facility using […]

Old Nogales Interceptor Phase I and Phase III 

Performing as the CMAR for RWRD, Borderland teamed with B&F in this multi-phase project to complete the installation of a sewer system. Phase 1: B&F installed 1,442 LF of a new 10-inch sewer line within Drexel Road, between Park Avenue and 1st Avenue. The project included a temporary bypass of the existing 18-inch sewer line […]

Marana Sewer Infrastructure Project

This project was run across Sanders Road just south of Marana Road and combined all the flow to the Marana Wastewater Treatment Plant. B&F constructed two phases for this project to complete a system tie-over and provide additional conveyance options to combat issues with inflow and infiltration (I&I). Our team installed two customized diversion structures, […]

Layton Lakes Force Main Rehabilitation

This CMAR project involved the rehabilitation of over 25,000 LF of existing 14- and 18-inch cement-lined DIP force mains. Scope of work included the mixed-method repair and rehabilitation of 24,626 LF of existing parallel 14- and 18-inch cement-lined ductile iron pipe wastewater force mains using HDPE slip lining trenchless technology and open-cut replacement. B&F evaluated […]

North Rillito Interceptor Rehabilitation

Performing as the CMAR for Pima County Regional Wastewater Reclamation Department (RWRD), B&F Contracting rehabilitated over 53,000 LF of existing 15-inch through 36-inch sewer using CIPP, and new pipe. To facilitate this project more than 132,000 LF of large diameter HDPE pipe was fused, installed, and removed in order to manage existing sewer flows. Existing […]

Trunk Sewer Rehabilitation

The project included the rehabilitation of 5200 LF of 30” T-lock RGRCP sewer running in Bell Road and Beardsley Road by installing CIPP Liner, 900 LF of 15” and 16” Sewer on Happy Valley Road using CIPP liner, and a lining point repair on 107th Ave. Avenue and Burnett Road using UV Cure. Project required […]

SROG Southern Avenue Interceptor and Manhole Rehabilitation

The project consisted of approximately 140 manholes, 4 bypasses, 5 sections of pipe to rehab, 48 Ring and Cover Adjustment/Replacements & 1 flow diversion. The manhole work was a combination of epoxy rehabilitation and PVC liner repair that spread nearly 17 miles from 87th Avenue and Broadway to 48th Street and Southern Avenue. B&F bypassed […]

Thomas Rd Transmission Main Rehabilitation

vercame design challenges due to insufficient as-built documents through early and thorough site investigations. B&F self-performed the installation of over 16,300 LF of HDPE slip lining using the close-fit trenchless method. This included over 8,520 LF of 30-inch SDR21 DIPS, and 7,780 LF of 36-inch SDR21 DIPS HDPE piping into existing 36-inch and 45-inch PCCP […]

2nd and Watkins Emergency Sewer Project

B&F responded to an emergency for the City of Phoenix on the Salt River Outfall Pipeline at Watkins and Central, where a camera and sewer plug were caught on debris under the flow line. We worked with Brown and Caldwell and the City to provide on-the-spot design assistance to quickly get the 72-inch line under […]

;